The Hounslow and Thames Water Strategic Partnership was established to deliver sustainable drainage systems across the London Borough of Hounslow and reduce existing pressure on the Thames Water sewer network.

The five-year partnership brought together the London Borough of Hounslow, Thames Water, Metis Consultants and Thames21. We were supported by delivery partners including Ground Control, Hounslow Highways and Meristem. The programme focused on the Mogden Sewage Treatment Works catchment, where population growth, urban development and extensive impermeable surfaces were placing increasing pressure on sewer capacity. Metis provided programme management, technical advisory and engineering design support on this catchment-scale SuDS scheme.

This helped the partnership move from a borough-wide longlist of opportunities through feasibility, design, procurement and construction. The completed programme comprises 45 SuDS features across nine locations, managing runoff from approximately 6.41 hectares of land.

 

The Challenge

Hounslow needed to reduce the volume and rate of surface-water runoff entering an already constrained sewer network. During intense rainfall, runoff from roofs, highways and other impermeable areas can rapidly enter the drainage system, contributing to local flood risk and creating additional pressure at Mogden Sewage Treatment Works, which is the third largest STW in the country.

Delivering a catchment-scale SuDS retrofit programme presented the following challenges:

  • identifying sites that could provide meaningful catchment benefits within a densely developed urban environment
  • retrofitting SuDS around existing utilities, highways, schools, parks and live public spaces
  • coordinating multiple landowners, council departments, delivery partners and contractors
  • designing systems that could temporarily store water and discharge it at a controlled rate
  • balancing water quantity objectives with water quality, biodiversity, amenity and maintenance requirements
  • developing individual schemes that collectively contributed to a strategic, catchment-scale outcome
  • maintaining consistent design and delivery standards across different site types and construction packages

Rainwater needed to be disconnected or diverted from existing roofs, gullies and surface-water drainage systems before being conveyed into new SuDS within highways, schools and parks.

 

Our Approach to Delivering Catchment-Scale SuDS

Metis supported the partnership through the full project lifecycle, combining programme-level coordination with site-specific technical design.

 

Opportunity identification and feasibility

Metis worked with Hounslow and Thames Water to develop and assess a longlist of potential SuDS locations. Opportunities were prioritised using information including flood-risk mapping, sewer-network data, the number of properties at risk and the availability of suitable public land.

Potential locations were then subjected to feasibility investigations to establish:

  • existing drainage arrangements and potential sewer connection points
  • below-ground utility constraints
  • topographical conditions and surface-water flow routes
  • ground conditions and potential infiltration rates
  • land ownership, access and operational requirements
  • potential storage capacity and wider environmental benefits

Drainage CCTV surveys, ground investigations, topographical surveys and utility surveys were used to reduce uncertainty before schemes progressed to detailed design.

 

Design and procurement

Metis developed site-specific designs for raingardens, school planters and larger attenuation features. These designs accounted for the individual setting of each scheme while maintaining the programme’s strategic objectives.

The design process included:

  • hydraulic and surface-water assessments
  • development of concept and detailed designs
  • integration of above and below-ground storage
  • controlled discharge and overflow arrangements
  • landscape and planting design coordination
  • consideration of operational access and long-term maintenance
  • preparation of drawings, specifications and designers’ risk information
  • production of Pre-Construction Information packages for tendering

Where storm events exceed the design capacity, overflow arrangements allow flows to reconnect safely to the existing Thames Water network.

 

Programme and stakeholder management

Metis supported Hounslow as part of the Programme Management Team and as technical adviser. Stakeholder engagement was embedded throughout delivery. Thames21 led community engagement, working with schools, Friends groups, residents and other organisations associated with the project sites.

 

Construction and Delivery

The partnership delivered SuDS in schools, parks and highway environments:

  • The Green School for Girls: one raingarden and ten planters.
  • Smallberry Green Primary School: one raingarden and 15 planters.
  • College Road: three highway raingardens.
  • Thornbury Park: one large attenuation feature with below-ground storage and above-ground landscaping.
  • Renfrew Road: one highway raingarden.
  • Beaversfield Park: a large attenuation feature with above and below-ground storage and landscaping.
  • Wellington Road North: a large attenuation feature with above and below-ground storage and landscaping.
  • Burns Way and Shelley Crescent: eight highway raingardens.
  • Brabazon Road: three highway raingardens.

Metis provided technical support, responded to design queries and coordinated with Hounslow and the appointed contractors on site. Larger schemes required careful integration of underground storage with new landscaping, paths, drainage connections and operational park requirements. Metis’s design also had to adapt to challenges during construction including a TWUL Foul sewer running beneath the excavation area, tree roots and asbestos below ground.

At Beaversfield Park and Wellington Road North, the designs included significant underground attenuation. Design-stage information identified proposed storage volumes of approximately 800 m³ at Beaversfield Park and 585 m³ at Wellington Road North.

 

Outcomes and Value Delivered

The programme has delivered a coordinated network of SuDS across the borough rather than a series of isolated drainage interventions. Its principal innovation was its combination of strategic catchment planning with practical retrofit delivery.

Key outcomes include:

  • 45 SuDS features delivered across nine locations
  • management of surface-water runoff from approximately 6.41 hectares
  • 17 raingardens, 25 school planters and three larger attenuation features
  • reduced peak flows entering the Thames Water sewer network
  • temporary storage and controlled release of rainfall following storms
  • improved water quality through filtration and settlement of pollutants
  • new planting and habitats at schools, parks and highway sites
  • greening of previously hard-surfaced or underused urban areas
  • increased public and school awareness of sustainable water management
  • a consistent operational and maintenance framework for the new assets

The programme has also created a long-term legacy. Following the partnership’s catchment-based opportunity work, Hounslow has developed a pipeline of 85 potential schemes that can support future funding applications and continued investment in blue-green infrastructure.

 

International Recognition

In October 2024, the programme hosted a delegation from South Korea that included university professors and representatives from the Korean Ministry of Environment and Korea Environment Corporation.

The delegation visited SuDS at several partnership sites, and demonstrated how a UK local authority, water company, designers, engagement specialists and contractors had worked together to deliver retrofit SuDS across different urban settings.

 

Why Metis?

Metis brings together water engineering, sustainable drainage design and programme management expertise. Our ability to work from strategic opportunity identification through feasibility, detailed design and construction support allowed Hounslow to manage a catchment-scale SuDS programme involving multiple land uses, stakeholders and contractors.

By combining strong technical governance with practical, site-specific design, Metis helped the partnership turn a strategic funding opportunity into a visible network of blue-green infrastructure with measurable catchment and community benefits, and a strong SuDS pipeline for long-term legacy.

 

Interested in learning more about our work?

Explore some of our other Metis case studies to discover our recent projects.

If you’re seeking an experienced and passionate engineering team to partner with on your next project, get in touch with us today.

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.