The five-year partnership brought together the London Borough of Hounslow, Thames Water, Metis Consultants and Thames21. We were supported by delivery partners including Ground Control, Hounslow Highways and Meristem. The programme focused on the Mogden Sewage Treatment Works catchment, where population growth, urban development and extensive impermeable surfaces were placing increasing pressure on sewer capacity. Metis provided programme management, technical advisory and engineering design support on this catchment-scale SuDS scheme.
This helped the partnership move from a borough-wide longlist of opportunities through feasibility, design, procurement and construction. The completed programme comprises 45 SuDS features across nine locations, managing runoff from approximately 6.41 hectares of land.
Hounslow needed to reduce the volume and rate of surface-water runoff entering an already constrained sewer network. During intense rainfall, runoff from roofs, highways and other impermeable areas can rapidly enter the drainage system, contributing to local flood risk and creating additional pressure at Mogden Sewage Treatment Works, which is the third largest STW in the country.
Delivering a catchment-scale SuDS retrofit programme presented the following challenges:
Rainwater needed to be disconnected or diverted from existing roofs, gullies and surface-water drainage systems before being conveyed into new SuDS within highways, schools and parks.
Metis supported the partnership through the full project lifecycle, combining programme-level coordination with site-specific technical design.
Metis worked with Hounslow and Thames Water to develop and assess a longlist of potential SuDS locations. Opportunities were prioritised using information including flood-risk mapping, sewer-network data, the number of properties at risk and the availability of suitable public land.
Potential locations were then subjected to feasibility investigations to establish:
Drainage CCTV surveys, ground investigations, topographical surveys and utility surveys were used to reduce uncertainty before schemes progressed to detailed design.
Metis developed site-specific designs for raingardens, school planters and larger attenuation features. These designs accounted for the individual setting of each scheme while maintaining the programme’s strategic objectives.
The design process included:
Where storm events exceed the design capacity, overflow arrangements allow flows to reconnect safely to the existing Thames Water network.
Metis supported Hounslow as part of the Programme Management Team and as technical adviser. Stakeholder engagement was embedded throughout delivery. Thames21 led community engagement, working with schools, Friends groups, residents and other organisations associated with the project sites.
The partnership delivered SuDS in schools, parks and highway environments:
Metis provided technical support, responded to design queries and coordinated with Hounslow and the appointed contractors on site. Larger schemes required careful integration of underground storage with new landscaping, paths, drainage connections and operational park requirements. Metis’s design also had to adapt to challenges during construction including a TWUL Foul sewer running beneath the excavation area, tree roots and asbestos below ground.
At Beaversfield Park and Wellington Road North, the designs included significant underground attenuation. Design-stage information identified proposed storage volumes of approximately 800 m³ at Beaversfield Park and 585 m³ at Wellington Road North.
The programme has delivered a coordinated network of SuDS across the borough rather than a series of isolated drainage interventions. Its principal innovation was its combination of strategic catchment planning with practical retrofit delivery.
Key outcomes include:
The programme has also created a long-term legacy. Following the partnership’s catchment-based opportunity work, Hounslow has developed a pipeline of 85 potential schemes that can support future funding applications and continued investment in blue-green infrastructure.
In October 2024, the programme hosted a delegation from South Korea that included university professors and representatives from the Korean Ministry of Environment and Korea Environment Corporation.
The delegation visited SuDS at several partnership sites, and demonstrated how a UK local authority, water company, designers, engagement specialists and contractors had worked together to deliver retrofit SuDS across different urban settings.
Metis brings together water engineering, sustainable drainage design and programme management expertise. Our ability to work from strategic opportunity identification through feasibility, detailed design and construction support allowed Hounslow to manage a catchment-scale SuDS programme involving multiple land uses, stakeholders and contractors.
By combining strong technical governance with practical, site-specific design, Metis helped the partnership turn a strategic funding opportunity into a visible network of blue-green infrastructure with measurable catchment and community benefits, and a strong SuDS pipeline for long-term legacy.
Explore some of our other Metis case studies to discover our recent projects.
If you’re seeking an experienced and passionate engineering team to partner with on your next project, get in touch with us today.