As part of the Enfield Town Liveable Neighbourhoods programme, Enfield set out to create a safer, greener, more accessible and more welcoming public realm. Metis was appointed to lead and coordinate the public realm detailed design. This translated the established concept into practical and buildable improvements.
The wider scheme was shaped through several phases of community engagement, design workshops and transport modelling. These established five central principles, creating a town centre that:
Metis’s role included detailed highway engineering, drainage and SuDS integration, lighting and CCTV coordination, design risk management, specifications, bills of quantities and support during construction.
Enfield Town Centre is a busy and operationally complex urban environment. Its roads, public spaces, commercial frontages, transport interchanges and community facilities all needed to remain accessible during design and construction.
The town centre’s existing layout created several barriers. High traffic volumes and limited crossing opportunities weakened connections between key destinations. These included Church Street, the shopping areas, Enfield Town Station and Enfield Town Park. The park itself was separated from the commercial centre by Cecil Road, while the station arrival environment lacked legibility and comfortable onward routes for pedestrians and cyclists.
In addition, the project had to address:
Phase 1 was delivered between July and November 2024. This required close coordination between the design and construction teams to manage changes, minimise disruption and maintain progress in a live town-centre setting.
Metis adopted a people-centred, evidence-led and collaborative approach. Healthy Streets and inclusive-design principles informed our work, while technical investigations provided necessary evidence to develop safe, durable and buildable proposals. We undertook this work collaboratively with the council, Transport for London, TKJV, Norman Rourke Pryme, LDA Design and specialist delivery partners.
Phase 1 concentrated investment on improvements that could provide early community benefits. Phase 2a delivered a series of highway, public realm and sustainable transport improvements – designed to enhance connectivity, support local businesses and improve the experience of visitors.
Metis began by reviewing the concept design and available project information, undertaking gap analysis, design risk assessments and site walkovers. We helped coordinate additional investigations – including topographical surveys, PAS:128 utility mapping, ground-penetrating radar, drainage surveys, trial holes and arboricultural and ecological input.
These investigations were especially important in a utility-rich environment, and enabled us to refine drainage features, planting locations, crossing alignments and construction details before works reached site.
Metis developed the public realm detailed design, integrating engineering requirements with the wider landscape and placemaking vision. The design package covered areas including:
The design was structured so that a coordinated full scheme general arrangement could inform a standalone Phase 1 construction package. A further detailed design followed for the remaining works.
Key interventions in Phase 2a included a new raised double crossing linking Palace Exchange Shopping Centre with the historic Enfield Market. This created a safer and more direct pedestrian route. We enhanced the public realm in front of the market by introducing new seating, public artwork and street trees. Crossing facilities between Palace Gardens and the town centre were also upgraded. A new bus lane along Church Street was introduced to improve bus journey times and service reliability. A new red route and associated CCTV enforcement on the High Street helped manage stopping and loading activity.
Rain gardens and other SuDS features were incorporated as a fundamental part of the public realm design, rather than as an isolated drainage intervention. These contribute planting, biodiversity, shade and visual interest. The completed nature-based SuDS manage runoff from a catchment of approximately 706m² and provide around 70m³ of attenuation.
The design included wider footways, improved crossing points, better kerb alignments and a new step-free route through Library Green. These strengthen the connection between the town centre and Enfield Town Park.
At Little Park Gardens East, the removal of through traffic created the opportunity for a new civic space at Saddlers Square. Seating, planting, accessible routes and co-designed art transformed the location into a place where people can pause, meet and spend time. Local artists, poets and school pupils contributed to the artwork, helping connect the space to Enfield’s local identity and heritage.
Regular technical workshops, risk reviews and coordinated design iterations brought together the council, Transport for London, Metis, Norman Rourke Pryme, LDA Design and TKJV. Metis continued to provide responsive design support during construction.
The team also responded to design development requirements involving existing trees, path alignments, the Cecil Road and Town Park corner, lighting, street furniture, parking arrangements and other value-engineering changes.
The project delivered a coordinated package of highway, public realm, active travel and environmental improvements. These include:
We have recreated the new Saddlers Square as a distinctive new place, while strengthening community ownership of the wider transformation. Positive public comments have highlighted the benefit of the new square. These have particularly focused on its pedestrian-friendly character, and the improvement provided by additional crossings and street furniture.
Through integrated engineering, multidisciplinary coordination and responsive construction support, Metis helped turn an ambitious concept into practical first and second phases of town centre transformation. The project provides a strong foundation for subsequent phases and demonstrates how public realm investment can deliver safer movement, climate resilience and a stronger sense of place at the same time.