The work formed part of a wider programme to improve surface water management and climate resilience through rain garden design and other planted drainage features. The completed scheme is identified among the SuDS projects delivered across Barnet to improve flood resilience. Metis developed the scheme from the findings of the initial Critical Drainage Area study through detailed design and construction information. The resulting intervention introduced a roadside rain garden that captures highway runoff, temporarily stores water and controls its onward discharge, while adding planted green infrastructure to the streetscape.
York Road lies within a recognised Critical Drainage Area. The existing highway and conventional drainage system are vulnerable to the effects of intense rainfall and surface water runoff. The challenge was to introduce additional drainage capacity within a constrained, operational residential street without compromising access, pedestrian movement or highway safety.
The design also needed to respond to the practical constraints commonly encountered when retrofitting SuDS into an existing highway. These included buried utilities, existing gullies and drainage connections, limited verge and footway space, traffic management requirements and long-term maintenance access.
The challenge included:
Finally, the design package included road markings and signage – provided by Metis’s highways team. These ensured the highway was up to standard post-construction. Originally, there had been a paved traffic island near the proposed SuDS. Metis therefore designed the rain garden to replace the traffic island as a road calming measure.
Metis combined feasibility assessment, drainage modelling, detailed civil engineering design and health and safety risk management to develop a practical highway SuDS scheme.
The work built on an earlier feasibility study commissioned by the London Borough of Barnet and TKJV for the wider Longmore Avenue Critical Drainage Area. This study identified potential opportunities for roadside rain gardens and surface-water storage, including options on the eastern side of York Road and close to the junction with Longmore Avenue.
To confirm the constraints affecting delivery, C2 utility-record searches and a ground-penetrating radar utility survey were undertaken. The proposed feature locations were then selected to avoid buried services in the footway wherever possible.
Metis developed and tested the hydraulic performance of the rain garden design proposals across a range of rainfall events, including climate change scenarios. The design incorporated a maximum surface ponding depth of 150 mm and considered performance for events ranging from the 1-in-2-year storm through to the 1-in-100-year storm with climate-change allowances.
The rain garden was designed to intercept runoff from the highway and manage it through temporary surface storage, engineered drainage layers and controlled discharge. Existing drainage connections were reused where practicable. This minimised the extent of new below-ground infrastructure, and reduced works within the carriageway and footway.
Metis prepared the detailed design and construction information required to move the proposal into delivery. This included:
The rain garden locations were developed so that existing footway widths would not be reduced. The design also addressed visibility for road users, construction risks, sediment blockages and the need to protect residents and site personnel during the works.
The scheme progressed to construction during autumn 2025. Metis supported the transition from design to construction; we provided for-construction information and addressed the practical requirements associated with implementing a planted drainage feature in a live highway.
Our maintenance plan and planting schedule also provided the basis for regular inspection, vegetation management, sediment removal and the continued operation of the inlet and outlet arrangements.
The York Road rain garden design has delivered a nature-based drainage intervention within an established residential highway. The completed scheme forms part of Barnet’s wider programme of SuDS projects, intended to improve flood resilience across the borough.
With Metis’s specialist support, the project delivered:
The project demonstrates how targeted highway SuDS can transform small areas of roadside space into functional drainage infrastructure. By combining hydraulic engineering, highway design and landscape-led surface-water management, Metis helped the London Borough of Barnet deliver a practical and replicable response to urban flood risk.
Metis brings extensive experience in highway SuDS, drainage modelling, flood-risk management and the development of construction-ready design packages for local authorities. At York Road, this integrated approach enabled a constrained highway location to provide improved surface water management alongside environmental and streetscape benefits.
Explore some of our other Metis case studies to discover our recent projects.
If you’re seeking an experienced and passionate engineering team to partner with on your next project, get in touch with us today.