Alongside projects at Chandos Park, Lyndhurst Park and other locations, the Watling Park scheme sought to create more space for water, reduce flood risk and enhance the ecological and recreational value of this important community park. Metis developed a package of river corridor enhancement and wetland creation, designed to reroute the Burnt Oak Brook. We also held a series of co-design workshops alongside Land Use Consultants and Thames21 to finalise landscape improvements.
The scheme integrates natural flood management principles with park improvements to ensure long-term environmental and community benefits. These help the site to adapt to future climate challenges, while creating a more attractive, accessible public space.
Rainfall patterns had become more intense and urban runoff increased across the Silk Stream catchment. The park and surrounding area consequently faced increasing pressure from the Burnt Oak Brook flooding. At the same time, here was an opportunity to do more than simply manage water. The site could become a richer wildlife habitat, a more resilient landscape and a better place for the local community.
London Borough of Barnet had been seeking innovative ways to tackle flood risk while enhancing public spaces. Metis was brought in to deliver effective river restoration and wetland creation measures within a popular public park, complying strictly with Flood Risk Activity Permit requirements.
Key challenges included:
Watling Park sits within a constrained urban environment. Every flood risk intervention needed to reduce flood risk without compromising the park’s character and accessibility. Metis treated the project as an opportunity to reshape the relationship between water, people and nature. Metis’s design took the river from its previous concrete channel, flattened the gradient of the banks and brought it further into the park in a natural form. This allowed more water to be stored and reduced flow speed, while creating an aesthetically pleasing park feature.
The team worked closely with Barnet Council, Thames21, the Environment Agency, Thames Water and other delivery partners to deliver multiple benefits from a single coordinated scheme. A Thames Water pipe was daylighted and brought to five series of wetlands, with the aim of naturally improving water quality before it joins the river.
From the earliest feasibility studies, Metis focused on creating more space for water across the site.
Hydraulic modelling and flood assessments helped the team to understand how water moved through the park. These technical investigations informed a design centred around natural flood management principles rather than hard-engineered interventions. The resulting proposals introduced enhanced watercourse features, a network of new wetlands and carefully designed landscape improvements. All of these work together as a single system.
When heavy rainfall arrives, the landscape now has greater capacity to accommodate water. During drier periods, those same features provide valuable habitats, attractive views and opportunities for visitors to connect with nature.
Metis led the technical development of the scheme and managed the project. This involved coordinating hydraulic modelling, civil drainage design and stakeholder engagement. This collaborative approach helped shape a series of interventions that extended beyond flood management. Alongside enhancements to the Burnt Oak Brook corridor and wetland creation, the scheme delivered upgraded entrances, improved pathways and public realm enhancements. These were designed to create a more welcoming and accessible park environment.
As the project moved into delivery and construction, Metis remained closely involved. We provided construction support, responded to site challenges and coordinated design refinements as works progressed. The team worked alongside contractors and stakeholders to ensure that technical requirements, environmental objectives and community priorities remained aligned.
This continuity was crucial in maintaining design integrity and ensuring that the project’s wider objectives were fully realised.
The Watling Park project has delivered a significant environmental improvement within the Silk Stream catchment. Metis balanced flood resilience, environmental enhancement and public amenity to help Barnet progress its wider climate adaptation objectives.
Key outcomes include:
Through close collaboration with Barnet and partner organisations, Metis helped transform Watling Park into a more resilient, environmentally valuable and community-focused green space. The project demonstrates how natural flood management can be successfully integrated into urban parks to deliver lasting benefits for people and nature.
Explore some of our other Metis case studies to discover our recent projects.
If you’re seeking an experienced and passionate engineering team to partner with on your next project, get in touch with us today.