Newton Park Flood Alleviation and River Restoration Project

PROJECT BRIEF

The park originally flooded after heavy rainfall causing damage to residential properties around and downstream of the park. Metis gained funding for and designed the Newton Park West Flood Storage Area and River Restoration Scheme.

OUR APPROACH

  • Working closely with Harrow Council to complete a gap analysis to understand the flood causes and then provide technical advice accordingly.
  • Preparing project case to gain appropriate funding for scheme.
  • Assessment of the existing flood mitigation performance within and around the park.
  • After evaluation, developing SuDS features such as wetlands to reduce risk of flooding and restore the natural environment.

PROJECT OUTCOMES

Through this design, Harrow received:

  • Prepared the Outline Business Case that was successful in allocation of approximately £300k of capital funding by the Environment Agency and the Thames Region Flood and Coastal Committee to deliver the project.
  • Concept design of wetlands which could cope with large amount of rainfall and provide significant water quality improvements to The Roxbourne Brook.
  • Detailed design of  proposed SuDS features.
  • Support in the construction work through design of flow control structures and setting the final water levels for the wetlands.

PROJECT CONTACT

Mike Mair

Team Lead, Lead Local Flood Authority Support

E: michael@metisconsultants.co.uk

T: 020 8948 0249

CLIENT CONTACT

Mick Bradshaw

Deputy Team Leader, Commissioning and Infrastructure

By submitting this form I agree to my details being used in sole connection with the intended enquiry. Please check our privacy policy to see how we protect and manage your submitted data.